Today marks the 28th day of construction. Got the bulk heads installed, inter gunnels. Also epoxyed a 1/2" copper pipe through the bow and stern to run a rope through. Yes, I'll cut them off flush with the sides ( I know how yalls minds work ) Added an extra block for strength. This Saturady is the Nechec River Race, going to take the boat down and see what kind of comments I get, might even get a new idea or two.
		
		
	
	
		 
	
		 
	
		 
	
			
			 
	 
	 
	 
				
		